SERVICE LIFT PROJECTS FOR HOSPITALITY & BACK-OF-HOUSE OPERATIONS

Project-led lift routes for hotels, restaurants, bars, pubs, clubs and venues – moving food, drinks, laundry,
stock, trolleys and service items between floors around the way the building actually operates.

SEND US YOUR PLANS OR PROJECT DETAILS

Send drawings, kitchen or back-of-house layouts, photos, service-route notes, existing lift details or finish requirements and we’ll help identify the right lift route for your hospitality project.

Kitchen Layout

Photos

Drawings / Plans

Shaft or opening details

Existing lift photos

Project Notes

Secure. Private. Expert review.

HOSPITALITY SERVICE ROUTES

BUILT AROUND SERVICE FLOW, OPERATIONS AND GUEST AREAS

A hospitality lift project starts with how the building works. The right solution depends on what needs moving, where the route begins and ends, how frequently it will be used and whether the lift sits in a guest-facing or back-of-house area.

A compact food lift may suit plates and drinks between a kitchen and dining floor. A trolley lift may be needed for linen, housekeeping supplies or loaded service trolleys. Larger stock and operational goods may require a goods lift. Where space, loading or finish requirements are less straightforward, a bespoke service lift route may be more suitable.

WHAT NEEDS MOVING?

Food, drinks, plates, glassware, linen, laundry, housekeeping supplies, stock, service trolleys and operational items.

WHERE DOES IT NEED TO GO?

Kitchen to restaurant, basement to bar, cellar to service area, laundry to guest floors, storage to back-of-house or between event and private dining spaces.

WHERE WILL THE LIFT BE SEEN?

Some lifts sit entirely behind the scenes. Others need to integrate discreetly into bars, restaurants, clubs, suites or guest-facing interiors.

IS THIS A NEW OR EXISTING ROUTE?

SLP can review new projects, hospitality fit-outs, existing shafts, older food lifts and service lifts that may need refurbishment or replacement.

FOOD & DRINK SERVICE

FOOD, DRINKS AND SERVICE ITEMS BETWEEN FLOORS

Hospitality service routes often connect areas that cannot operate efficiently at the same level. This may involve moving plated food from a basement kitchen to the restaurant, drinks and glassware between a cellar and bar, or crockery and service items between private dining, event and preparation areas.

The lift should be selected around the items being moved, the service frequency, loading height, available opening and how staff will use the route during busy periods.

For smaller counter-height loads, a dumbwaiter or food lift may be suitable. Where loaded trolleys need to roll directly into the lift, a floor-level trolley lift may be the better route.

HOTEL & BACK-OF-HOUSE OPERATIONS

LAUNDRY, HOUSEKEEPING, STOCK AND TROLLEYS

Hotels and larger hospitality buildings often need to move far more than food. Linen, laundry, housekeeping supplies, room stock, cleaning materials and service trolleys may all need reliable movement between stores, back-of-house areas and guest floors.

These projects are usually defined by trolley dimensions, loaded weight, floor-level access, landing space and the route staff take through the building. For larger operational loads, SLP can also review whether a goods lift is more suitable than a compact service or trolley lift.

FRONT-OF-HOUSE & BACK-OF-HOUSE

DISCREET WHERE VISIBLE. ROBUST WHERE OPERATIONAL.

The appearance and specification of a hospitality lift depend heavily on where it sits.

In a guest-facing restaurant, bar, private club or premium hotel area, the lift may need to integrate into joinery, wall finishes or architectural details with discreet controls and carefully considered landing doors.

Behind the scenes, priorities may shift towards durability, hygiene, loading access, straightforward operation and reliable daily use.

SLP reviews both sides of the requirement so that the lift suits the building visually without compromising the way it needs to perform.

GUEST-FACING INTEGRATION

OPERATIONAL PERFORMANCE

WHAT USUALLY NEEDS DEFINING

WHAT IS BEING MOVED?

Food, plates, pans, crockery, drinks, stock, trolleys or service items.

WHERE DOES IT START AND ARRIVE?

Kitchen to dining, basement to ground floor, storage to service area, bar to upper floor or back-of-house to front-of-house.

HOW SHOULD IT LOAD?

Counter-height, hatch-style, cabinet integration, floor-level trolley loading or back-of-house access

HOW MANY FLOORS OR STOPS?

Single floor route, basement to ground, multiple floors or split-level service movement

WHAT CONSTRAINTS EXIST?

Shaft space, existing openings, building fabric, fire requirements, kitchen layout, access or live-site restrictions

WHO IS INVOLVED?

Kitchen designers, architects, contractors, operators, facilities teams or private hospitality clients.

HOSPITALITY PROJECTS THAT NEED MORE THAN A STANDARD LIFT ANSWER

MULTIPLE TYPES OF MOVEMENT

Where the building needs to handle food, drinks, laundry, stock or trolleys across different routes.

LIVE OR OPERATIONAL SITES

Where access, disruption and the continued operation of the hotel, restaurant or venue need considering.

GUEST-FACING INTEGRATION

Where the lift needs to sit discreetly within a restaurant, bar, club, suite or premium interior.

AWKWARD OR CONSTRAINED ROUTES

Where limited shaft space, existing openings, unusual floor layouts or difficult access affect the solution.

What our customers want to know

FREQUENTLY ASKED QUESTIONS

The right lift depends on what needs moving, how it will be loaded and the route through the building. Smaller counter-height loads may suit a dumbwaiter or food lift. Wheeled trolleys usually require floor-level loading, while larger stock or operational goods may need a goods lift. SLP can review the requirement before the lift type is finalised.

Yes. Larger hotels and hospitality buildings may have several different movement requirements. These may need separate lift routes or different lift types depending on the load, frequency, floors served and operational layout.

Yes. The opening position, landing doors, controls and finishes can be reviewed around the surrounding interior. Guest-facing integration needs to be coordinated early with the architect, designer or project team.

Existing hospitality lifts can be reviewed for repair, refurbishment, modernisation or replacement. Photos, reports, data plates and shaft or opening details help identify what may be practical.

Yes, the effect on a live operating environment can form part of the project review. Access, working areas, disruption and programme requirements need to be understood before the route is confirmed.

Useful information includes drawings, layouts, photos, what needs moving, where it starts and finishes, the number of floors, whether the route is guest-facing or back-of-house, and any existing lift details.